top of page

Alan Baird

Project: Alan Baird Machine Shop Epoxy
Location:  Allendale, NJ
Scope of Work: ~2500 sq. ft. of epoxy coatings
Schedule:  3 days
General Contractor: Owner direct

Surface Solutions was contracted to grind and epoxy ~2500 sq. ft. of warehouse in preparation for a machine shop to be built in the warehouse.  The floor was ground, patched, and repaired prior to coatings.  Coatings were completed with 2 coats of Sherwin Williams MPE.

1723478568699.jpeg
1723478568783.jpeg

click for more

Eastern Glass Production Line

Scope of Work: ~7000 sq. ft. of Self Level and Epoxy Coatings
Schedule:  8 days
General Contractor: Owner direct

Surface Solutions was contracted to build a hyper level floor that will be used to construct a new production line for a glass factory.  The production line required a floor that was level prior to applying epoxy coatings.  Based on the durability requirements for the production line, an epoxy primer with full sand broadcast was utilized under the self level.  Project schedule was built around the equipment delivery and production shut down.
The system was built as follows:
Grind existing concrete with bush hammers in order to create a Concrete Surface Profile (CSP) of 4 to bond self level system. Furnish and install CTS RapidSet TXP Fast epoxy primer with full sand broadcast to rejection. Remove excess sand and install self leveling pins.  Pins were installed relative to the highest point of the floor. Furnish and install CTS RapidSet LevelFlor using an Imer Koine4 pump.  Material averaged about 3/4in depth. Grind newly poured self level with low grit metal bond diamonds in order to create a CSP 3 to bond epoxy coatings. Furnish and install Sherwin Williams MPE epoxy as base coat.  System was installed with 2 different colors to create a layout in the floor. Furnish and install Sherwin Williams 4850 Polyaspartic Urethane as top coat.

1723478805902.jpeg
1723478805829.jpeg

click for more

Scientific Design

Scope of Work: ~3000 sq. ft. of epoxy coatings
Schedule:  4 days
General Contractor: Nationwide Contractors

Surface Solutions was contracted by Nationwide Contractors to build ~3,000 sq. ft. of epoxy flooring in an active machine shop.  Coatings needed to go under and around installed equipment.
Concrete required extensive patching after prep.  Project duration was 4 days and was completed with 2 coats of Sherwin Williams 3746 100% solids epoxy coatings.

1723480445234.jpeg
1723480445280.jpeg

click for more

  • Twitter
  • Youtube
  • LinkedIn
  • Facebook
  • Instagram
bottom of page